Description
ASME B30.18 – Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist)
B30.18 applies to the construction, installation, operation, inspection, and maintenance of hand-powered and power-driven overhead and gantry cranes that have a top or under running multiple girder bridge with a vertically guided carriage, with or without a top or under running trolley. The requirements included in this volume also apply to stacker cranes having the same fundamental characteristics, such as cantilever gantry and semi-gantry stacker cranes.
Product Details
- Published:
- 09/30/2021
- ISBN(s):
- 9780791874653
- ANSI:
- ANSI Approved
- Number of Pages:
- 38
- File Size:
- 1 file , 460 KB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus